For Managers and the Collaboration

  • MOU & SOW form
    see DocDB-394
  •  
 

In this space: entry into the (future, web-based) manager reporting system, the (future, web-based) physicist hours reporting, the change control request process, and other project management items.

 

Reviews

Director's Reviews and DOE reviews are listed and linked in the sidebar.

Internal Design Reviews

Internal reviews are those the Project organizes for itself, to help the experiment choose among design alternatives or to verify that the different parts of the detector are being integrated into a functional whole. Some of these are completely internal to the collaboration, while others utilize reviewers from outside the collaboration.

All materials from these reviews are in the MicroBooNE DocDB.

Internal Reviews Schedule

  • Detectors Design Review
    June 2009
  •  
  •  
  • Electronics Design Review
    June 2009
  •  
  •  
 

 